Change of the conveyor route  (2015)

  • Dismantling of insufficient and damaged beams
  • Meterage and production of the step transfers
  • Change of damaged lines of the transfer chains
  • Installation of supporting and centering beams

 

GRO of the step transfers of the body line EHB (2015)

  • Solution proposal
  • Drawing documentation
  • Transfer wheel production
  • Maintenance assistance at the change
  • Measurability of the cost-saving and downtime by 70%

 

GRO of Consul portals, for the loading and unloading of bodies (2015)

  • Solution proposal
  • Project documentation compilation
  • Production of supporting columns, spindles and travels
  • Management via inverters, DRS card and internal sensor on motors
  • Installation at the target point
  • Electrical documentation
  • Mechanical documentation
  • SW modification

 

Relocation of the body to the installation line: Drum B91 (2015)

  • Modification of the existing steel structure
  • Production of the roll drum fixture
  • Proposal and production of the roll drum
  • Installation at the target point

 

Production of the control sites for the check of the pressed part and varnish: New pressing hall (2014)

  • Solution proposal
  • Production and installation of the steel structure for the fixation of special UWE Braun lamps with automatic lighting regulator for the check of the pressed parts
  • Production of electrical automatic height setting table
  • Static review

Pressed parts conveyor from the body of the welding robotic site to the installation line (2014)

  • Solution proposal
  • Project documentation processing
  • Production of the conveyor and conveyor route
  • Production of beams for the transport of a body part
  • Installation at the target point
  • Mechanical documentation

Proposal and production of columns for the radio transmission (2015)

  • Solution proposal
  • Static review
  • Production according to the requirements
  • Height preparation works
  • Installation on the high-rise buildings

Proposal and production of columns for radio transmission (2015)

  • Solution proposal
  • Static review
  • Production according to the requirement
  • Installation on water tanks
  • Works in height

GRO of the installation sites (2014)

  • Steel structure for the installations on the site
  • Lighting and installation of electrical devices
  • Production and installation of the jigs

Thermovízia: Kontrola elektrorozvadzačov (2014)

  • Kontrola rozvadzačov thermovíznou kamerou
  • Vyhodnotenie teplotných grafov
  • Vyšpecifikovanie poškodených komponentov
  • Výmena komponentov
  • Meratelnost úspory nakladov a prestojov